  • MTL Rec Pool - Zero Beach Entry
  • MTL Rec Pool - Slides
  • MTL Rec Pool - Photo
  • MTL Rec Pool - Climbing Wall
  • 6-6-14 Snack Bar Area Concrete Work
  • 6-6-14 Short Seat Wall
  • 6-6-14 Grout for Depth Markers
  • 6-6-14 Caulking Concrete Joints
  • 6-5-14 Poured Short Seat Wall
  • 6-5-14 Formed Long Seat Wall
  • 6-4-14 Tile Depth Markers
  • 6-4-14 East End of Facility
  • 6-3-14 Zero Beach Deck
  • 6-3-14 Froms for Seat Wall 2
  • 6-3-14 Froms for Seat Wall
  • 6-3-14 Bathhouse
  • 6-2-14 Leisure Features
  • 6-2-14 East Side of Facility 2
  • 6-2-14 East Side of Facility
  • 6-2-14 Diving Board
  • 5-29-14 Leisure Features
  • 5-29-14 Leisure Features and Walkway
  • 5-28-14 Starting Blocks
  • 5-28-14 Slide Fencing
  • 5-28-14 Deck and Bathhouse
  • 5-28-14 Admissions Booth
  • 5-27-14 Leisure Features
  • 5-22-14 Pool Painting 2
  • 5-22-14 Pool Painting
  • 5-20-14 Southeast End of Pool
  • 5-20-14 Glass Curtain Wall
  • 5-19-14 Southeast End of Facility
  • 5-19-14 South End of Facility
  • 5-19-14 Roof Coping and Exterior Lighting
  • 5-19-14 East Side of Facility
  • 5-19-14 Deck on East Side of Pool
  • 5-19-14 Coping Installation
  • 5-19-14 Breezeway
  • 5-19-14 Bathroom Partitions
  • 5-16-14 Drinking Fountains
  • 5-16-14 Deck at South Side of Diving Well
  • 5-16-14 Bathroom Partitions
  • 5-16-14 Admissions Booth
  • 5-15-14 Dual Slide Tower
  • 5-14-14 Leisure Pool Floor Pour 5
  • 5-14-14 Leisure Pool Floor Pour 4
  • 5-14-14 Leisure Pool Floor Pour 3
  • 5-14-14 Leisure Pool Floor Pour 2
  • 5-14-14 Leisure Pool Connection to Main Pool 4
  • 5-13-14 Slide Installation 3
  • 5-13-14 Slide Installation 2
  • 5-13-14 Sinks
  • 5-13-14 Showers
  • 5-13-14 Roof Coping
  • 5-13-14 Leisure Pool Prep
  • 5-13-14 In-gutter Returns and Inlets
  • 5-13-14 Deck at Diving Well
  • 5-12-14 Slide Installation 4
  • 5-12-14 Slide Installation
  • 5-12-14 Pool Filter Tank
  • 5-9-14 View from Top of Slide Tower 2
  • 5-9-14 View from Top of Slide Tower
  • 5-9-14 Slide Installation (1)
  • 5-9-14 Pool Filter Tank Pour
  • 5-9-14 Painted Doors
  • 5-9-14 Bathhouse Roof
  • 5-8-14 Snack Bar Countertops and Cabinets
  • 5-8-14 Slide Tower Installation
  • 5-8-14 Pool Plumbing
  • 5-8-14 Ornamental Fencing
  • 5-8-14 Leisure Pool Water Feature Plumbing (1)
  • 5-8-14 Filter Tank Forms
  • 5-8-14 Entrance Gate Installation
  • 5-6-14 Zero Beach Leisure Pool Walls
  • 5-6-14 Zero Beach Leisure Pool North Wall
  • 5-6-14 Deck at Slide Tower
  • 5-2-14 Zero Beach Leisure Pool North Wall Footer 2
  • 5-2-14 West Pool Deck Pour, Dual Slide Tower Foote
  • 5-2-14 Unisex Bathroom Tile and Door Frame Finish
  • 5-2-14 Pool Filter Tank Floor Pour (1)
  • 4-29-14 Snack Bar Cabinets and Countertop
  • 4-29-14 Pool Filter Tank Forms
  • 4-29-14 Leisure Features Shipment
  • 4-29-14 Footers for Dual Slide Tower, Deck on West
  • 4-29-14 Bathhouse Decorative Lighting
  • 4-28-14 Zero Beach Leisure Pool South Wall Footer
  • 4-28-14 Zero Beach Leisure Pool Plumbing to Filter
  • 4-28-14 Tile in Showers
  • 4-28-14 Pool Gutter Installation
  • 4-28-14 Pathway Outside Pool Fence
  • 4-28-14 LED Lighting in Women's Changing Room
  • 4-21-14 Breezway Skylight
  • 4-21-14 Deck Drains and Forms
  • 4-21-14 Finished Diving Well Drain Boxes
  • 4-21-14 Future Diving Well Slide Footers
  • 4-21-14 Light Installation
  • 4-21-14 New Concrete Deck
  • 4-21-14 New Light Poles
  • 4-21-14 Roof and Skylight Installation
  • 4-21-14 Zero Beach Drain Boxes 2
  • 4-21-14 Zero Beach Drain Boxes
  • 4-16-14 Welding Pool Ladder Steps
  • 4-16-14 Slide Shipment 2
  • 4-16-14 Forms fo South Pool Deck
  • 4-16-14 Drywall in Breezeway
  • 4-16-14 Diving Well Main Drain Installation 2
  • 4-16-14 Diving Well Main Drain Installation 1
  • 4-10-14 Gas Line Installation 6
  • 4-10-14 Gas Line Installation 3
  • 4-10-14 Main Drain Hydros
  • 4-10-14 Main Drain Installation 2
  • 4-10-14 Main Drain Insallation
  • 4-10-14 Main Drain Line 2
  • 4-9-14 Tile Installation in Women's Changing Room
  • 4-9-14 Roofing Installation
  • 4-9-14 Pool Heater Delivery 3
  • 4-9-14 Pool Heater Delivery 2
  • 4-9-14 Pool Circulation System Installation 3
  • 4-9-14 Pool Circulation System Installation 2
  • 4-9-14 Lockers
  • 4-4-14 Lockers 4
  • 4-4-14 Lockers 3
  • 4-4-14 Lockers 2
  • 4-3-14 Wall Section Installation Near Shallow Wate
  • 4-3-14 Wall Section Installation Near Shallow Wate
  • 4-3-14 Wall Section Installation Near Shallow Wate
  • 4-3-14 Wall Section Installation Near Shallow Wate
  • 4-3-14 Tile Installation in Women's Changing Room
  • 4-3-14 Climbing Wall Delivery 3
  • 4/3/14 Climbing Wall Delivery #2
  • 3-26-14 Zero Depth Leisure Pool Excavation
  • 3-26-14 Roof Decking Removal for Skylights 2
  • 3-26-14 Roof Decking Removal for Skylights
  • 3-26-14 Pool Storage Roll Up Door
  • 3-26-14 New Roll Up Doors for Snack Bar
  • 3-26-14 Gas Line to Pool Heater
  • 3-26-14 Finish Paint Snack Bar Storage
  • 3-26-14 Excavation for Main Drain Lines 2
  • 3-26-14 Excavation for Main Drain Lines
  • 3-26-14 Duct Work Painting
  • 3-26-14 Duct Work Installation
  • 3-26-14 Diving Well Drain Excavation
  • 3-24-14 Removing Pool Wall Section at Zero Depth L
  • 3-24-14 Plumbing Pit for Spray Features at Zero De
  • 3-18-14 Storage Room B Floor Pour
  • 3-18-14 Snack Bar Counter and FRP Walls
  • 3-18-14 Pool Sandblasting
  • 3-18-14 Pool Filtration Demo
  • 3-18-14 Ground Face Block Wall in Breezeway
  • 3-18-14 Block Wall Sealer
  • 3-18-14 Admission Booth Block Walls
  • 3-12-14 Snack Bar Counter
  • 3-12-14 Sandblasting Equipment
  • 3-12-14 Pool Drain Line Excavation and Gutter Demo
  • 3-12-14 Filtration Settling Tank Installation
  • 3-12-14 Admission Booth Wall Construction
  • 3-7-14 Gutter Demo
  • 3-5-14 Pool Deck Removal
  • 3-5-14 Ground Face Block Wall in Breezeway
  • 3-5-14 Canopy at Snack Bar
  • 3-5-14 Canopy at Main Entrance
  • 3-5-14 Bathhouse Wall Construction
  • 2-26-14 Reset Existing Hot Water Tanks
  • 2-26-14 HVAC Ductwork Installation
  • 2-26-14 Concrete Piers for Canopy
  • 2-26-14 Bathhouse CMU Wall Construction
  • 2-18-14 Powder Coating on Starting Blocks 1
  • 2-12-14 New Interior Walls
  • 2-12-14 New Interior Wall and Door Frames
  • 2-12-14 Finished Bathhouse Floor- Mens Room 2
  • 2-12-14 Finished Bathhouse Floor- Mens Room
  • 2-12-14 Bathhouse Floor Prep Womens Room
  • 2-5-14 Bathhouse Floor Prep #2
  • 2-5-14 Bathhouse Floor Prep 1
  • 1-30-14 Concrete Floor Prep 2
  • 1-30-14 Concrete Floor Prep
  • 1-30-14 Bathhouse Plumbing Installation 2
  • 1-30-14 Bathhouse Plumbing Installation 1
  • 1-30-14 Bathhouse Footers 2
  • 1-30-14 Bathhouse Footers 1
  • Bathhouse Interior Work 1-16-14
  • New Piers and Steel Supports 1-16-14
  • Bathhouse Floor removal and Plumbing Installation
  • New Piers and Steel 2 1-13-14
  • New Piers and Steel 1-13-14
  • Subsurface Drainage Installation 4
  • Subsurface Drainage Installation 2
  • Subsurface Drainage Installation
  • Interior Wall Construction
  • Removal of Bathhouse Floors (2)
  • Stormwater Drain Installation 2
  • Stormwater Drain Installation
  • Temporary Shoring #2
  • Temporary Shoring
  • Wading Pool Demo 7
  • Wading Pool Demo 6
  • Wading Pool Demo 5
  • Wading Pool Demo 4
  • Wading Pool Demo 3
  • Wading Pool Demo 1
  • Exposed Footers for Open Air Corridor
  • Fairwell to the Faucet
  • Building Access Road for Drain Installation 2
  • Building Access Road for Drain Installation 1
  • Slide Demo 4
  • Slide Demo 3
  • Slide Demo
  • Bathhouse Demo 3
  • Bathhouse Demo 2
  • Bathhouse Demo

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to MTL Rec Swim Center Renovation Photos photos